is a CCGT (Combined Cycle Gas Turbine) power station located near Plymouth, Devon in South West England. Construction of the site started in 2008 and was commissioned in 2010. Total site capacity is 905 MW. High pressure steam system enables market leading efficiency (51.5 %), flexible design is capable of two-shift operation and minimum load, enhancing the plant´s capabilities. The combined cycle provides increased flexibility to National Grid for support and system services helping grid stability.