Back to map

Scandale

Managed by Ergosud, a joint venture  between EPH Group and A2A, it is situated in the central-eastern part of Calabria region. The plant has two combined gas-steam cycles, that can potentially generate together, with a total capacity of 814 MW and started operations in June 2010. It is a state-of-the-art thermal power plant, with a highly efficient and environmentally friendly technology. The plant  adopts a variety of technical solutions to optimise the use of natural resources and reduce environmental impact, such as the ‘zero liquid discharge’ system, which allows the reuse of all waste water, including in part rainwater and reducing to a minimum the intake of water from the outside.