Back to map

Nové Mesto nad Váhom

The Nové Mesto nad Váhom hydroelectric power plant is the second HPP in order on the diversion channel, with its technical parameters being the same as at the Kostolná HPP. As the Trenčianske Biskupice weird has a low retention capacity, the operation of this cascade is hydraulically closely linked to that of the previous cascade.

 

Hydroelectric plants

Slovenské elektrárne operates 31 hydroelectric plants. Their combined output is 1,652.7 MW, representing approximately 38.4% of the Company’s total installed capacity. Majority of the installations is located on the Váh River cascade, or the longest river in Slovakia. On average, the hydroelectric sources generate 2,070 MW annually (consumption of pumped storage power stations excluded), or some 11% of the electricity produced by Slovenské elektrárne.

Because of their very variable power output and operational flexibility, hydroelectric plants are capable to satisfy the swiftly changing demands in the daily-load diagram, pairing nicely with the base load supply covered by nuclear power plants. Slovenské elektrárne has 736.6 MW installed in river hydropower plants and 916.4 MW in pumped storage power stations.